The operating question
An East Texas operator wanted to know how much recompletion potential remained across its 30-well package. Over the life of the field, zones had been tested, produced and abandoned in different wells — and no single view showed what was left.
The engineering work
We built a wellbore utility chart for the entire package: a well-by-well, zone-by-zone map showing which intervals had already been tested or produced, and which remained behind pipe.
For the zones that remained, we evaluated whether each was economic to complete.
The action plan
The chart turned a 30-well history into a short list: more than a dozen recompletion candidates in untested or remaining zones that met the economic threshold.
The verified result
- 12+ recompletions identified across the package
- 165 BOPD of cumulative added oil production