Projects · Reserves & Asset Evaluation

A 72-well Permian reserve study for bank financing

A reserve study built on actual declines and actual costs, to support $18 million in bank financing.

Client
Permian Basin Non-Op
Location
Permian Basin
Services
Reserves & Asset Evaluation
Year
2022

The result

72-well reserve study supporting $18 million in bank financing.

The operating question

A Permian Basin focused non-operated working interest owner needed a reserve study across its 72 wells to secure $18 million in financing with its bank. The study had to stand up to the bank’s review while capturing the full value of the field.

The engineering work

  • PDP declines forecast from each well’s actual production history
  • Actual lease operating statement (LOS) costs used in the economics, rather than assumed costs
  • Upside opportunities identified across the asset base

The action plan

We combined the producing forecasts, actual costs and upside into a reserve case grounded in real performance — maximizing value while keeping the reserves defensible.

The verified result

The 72-well reserve study supported the owner’s $18 million financing with its bank.

More project stories.

Bring us the question.
Let’s define the next step.

Scroll to Top