Projects · Production Enhancement

Plunger lift and capillary strings across 60 Oklahoma gas wells

A well-by-well review of pressures and production pointed to the right fix for 35 wells.

Client
Oklahoma Gas Operator
Location
Oklahoma
Services
Production Enhancement
Year
2021

The result

Gas production up 75% and oil up 30% after installing plunger lift on 20 wells and capillary strings on 15 more.

The operating question

A small operator of Oklahoma gas wells wanted to know where its production was being held back — and which wells were worth spending money on.

The engineering work

We evaluated more than 60 wells using production data, tubing and casing pressures, and bottomhole pressures where they were available, to match each well with the intervention most likely to pay off.

The action plan

  • Plunger lift installed on 20 wells
  • Capillary strings installed on an additional 15 wells

The verified result

  • 75% increase in gas production
  • 30% increase in oil production

More project stories.

Bring us the question.
Let’s define the next step.

Scroll to Top