The operating question
A small operator of Oklahoma gas wells wanted to know where its production was being held back — and which wells were worth spending money on.
The engineering work
We evaluated more than 60 wells using production data, tubing and casing pressures, and bottomhole pressures where they were available, to match each well with the intervention most likely to pay off.
The action plan
- Plunger lift installed on 20 wells
- Capillary strings installed on an additional 15 wells
The verified result
- 75% increase in gas production
- 30% increase in oil production